Palaeohydrogeological Data Analysis and Model Testing (PADAMOT) |
| Deliverable No | Deliverable title | Delivery date | Nature | Dissemination level |
|---|---|---|---|---|
| D1 | Report on palaeohydrogeology and its use in PA | Month 6 | Re | RE |
| D2 | Preliminary Technical Implementation Plan |
Month 6 | Re | RE |
| D3 & D5 | Published scientific papers on results of (a) EQUIP project and (b) on methods for chemical and isotope compositions of zoned minerals | Month 12 Month 24 | [Re]/O [Re]/O | PU |
| D4 | Mid-term Technical Implementation Plan |
Month 18 | Re | RE |
| D6 | Database for palaeohydrogeological data from PADAMOT and repository site characterisation studies | Month 24 | Re/Da | RE* |
| D7 | Technical reports with results of interpretative modelling | Month 32 | Re/Si | RE |
| D8 | Final Technical Implementation Plan |
Month 32 | Re | RE |
| D9 | Final project report | Month 36 | Re | PU |
Re = Report
O = Other (Analyses)
Da = Dataset
Si = Simulations
RE = Consortium, EC and others agreed with Commission Services
PU = Public
Change delivery date to an actual date rather than a project month?
| ©NERC 2013. This site is hosted by the British Geological Survey but responsibility for the content of the site lies with the PADAMOT project not with the British Geological Survey, Questions, suggestions or comments regarding the contents of this site should be directed to Paul Degnan. Information regarding the copyright of BGS material and the BGS Privacy policy. |
||