Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 08: Health and Safety

Dataset description

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial scale CCS demonstration plant at Kingsnorth in Kent, South East England. The study yielded invaluable knowledge and the resulting material is available for download here. This chapter presents the Health and Safety Reports produced during the current FEED stage. HAZID/ENVID studies were carried out for the following sections of the project: Kingsnorth Power Plant (impact on and from CCS); Kingsnorth CO2 capture and compression plant; CO2 Pipeline (On and Offshore); Kingsnorth CO2 Injection Platform; Wells and Reservoirs. The results of the HAZID studies for the power plant and capture and compression plant are recorded in the 'HAZID Report' and 'HAZID Report Addendum' in this Chapter. The pipeline and platform HAZID is in section 6 and the wells and reservoirs HAZID in section 7. Other reviews, such as SIMOPS (Simultaneous Operations) studies have been carried out. A review of Major Accident Hazards for the pipeline has been undertaken and the outcome is described in the report 'ALARP Review Report for Genesis Scope of Work'. Design Risk Assessments (DRAs) were carried out by the design teams, with support from the Safety Consultant. DRAs were qualitative rather than quantitative, due to the early stage of design within FEED. The DRAs are collated and summarised in the 'CDM Design Risk Register'. A draft Pre-Construction Safety Report has been produced to further inform the design process, and enhance our understanding of the significant hazards, both safety and environmental, associated with these processes. This overall approach to Health and Safety is set out in more detail in the 'Health and Safety Design Philosophy' Further supporting documents for chapter 8 of the Key Knowledge Reference Book can be downloaded.

Further information

For more information please contact:

Enquiries

Environmental Science Centre, Nicker Hill, Keyworth
Nottingham
NG12 5GG

Tel : +44 (0)115 936 3143
Fax :+44 (0)115 936 3276
Email :enquiries@bgs.ac.uk

Associated dataset(s)

DECC: Reports from Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) project

Dataset details

Author(s) E.ON UK
Principal Investigator(s) E.ON UK
E.ON UK
Language English
Curator British Geological Survey
Supply media/format PDF; Version:N/A
Storage format Not available
Frequency of update not applicable
Start of capture {ts '2010-03-01 00:00:00'} Not known
End of capture {ts '2011-02-01 00:00:00'} February 2011
Online access URL  
Lineage statement These reports are the result of a Front End Engineering and Design (FEED) study undertaken by E.ON following the award of a FEED contract with the Department of Energy and Climate Change (DECC) in March 2010.
Supplementary information http://webarchive.nationalarchives.gov.uk/20121217150421/http:/decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/feed.aspx
Constraints
Access constraints intellectualPropertyRights (rights to financial benefit from and control of distribution of non-tangible property that is a result of creativity)
Use constraints intellectualPropertyRights (rights to financial benefit from and control of distribution of non-tangible property that is a result of creativity)
Additional info on constraints
Contact details
Department Enquiries
Organisation British Geological Survey
Address Environmental Science Centre, Nicker Hill, Keyworth
City Nottingham
County Nottinghamshire
Country United Kingdom
Postcode NG12 5GG
E-mail enquiries@bgs.ac.uk
Telephone +44 (0)115 936 3143
Fax +44 (0)115 936 3276
Keywords
Topic category code (ISO) geoscientificInformation (information pertaining to earth sciences)
Keywords CARBON
Keyword source BGS Keyphrases
Spatial details
Spatial Reference System Not available
Dataset extent
Coverage (Lat/Long) North boundary : 
East boundary  : 
South boundary : 
West boundary  : 
Metadata
Metadata language English
Metadata last updated 15th September 2016
Metadata standard compliance NERC profile of ISO19115:2003
Copyright and IPR
The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.